Main Menu

Skip to content
  • About
  • Bike Pics

Tag Archives: Engineered Lumber

Moving On (For the Moment)

August 29, 2015by blakestranz 6 Comments

The interior framing is largely finished. There are a few things still on the to do list, though. I can’t frame the all the walls in the bathroom yet because […]

Read Article →
Remodeling

Heavy Lifting

August 20, 2015by blakestranz 2 Comments

After a day of prep and getting the temporary support walls built, I was ready to set the first of two beams. These will hold up the roof and the […]

Read Article →
Remodeling

Post navigation

Recent Posts

  • Master Spa Bathroom — Part VI Wrap Up
  • Master Spa Bathroom Part V — Cabinets
  • Master Spa Bathroom – Part IV Fiber Optic Lighting
  • Master Spa Bathroom Part III – The Shower
  • Master Spa Bathroom Part II – Floor

Categories

  • Admin
  • Motorcycle Monday
  • Remodeling
  • Tools
  • Uncategorized

Recent Comments

  • techstrategiesintl on Master Spa Bathroom Part V — Cabinets
  • Master Spa Bathroom — Part VI Wrap Up | on Master Spa Bathroom Part III – The Shower
  • Master Spa Bathroom — Part VI Wrap Up | on Mirror, Mirror
  • Master Spa Bathroom Part V — Cabinets | on Mirror, Mirror
  • Master Spa Bathroom – Part IV Fiber Optic Lighting | on Master Spa Bathroom Part III – The Shower
Blog at WordPress.com.
  • Subscribe Subscribed
    • blakestranz.com
    • Already have a WordPress.com account? Log in now.
    • blakestranz.com
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar