Building Up and Tearing Down
A lot going on today! Yesterday, I set the shear transfer framing into the existing roof. I am waiting on the engineer to specify the hardware needs, since some of this […]
A lot going on today! Yesterday, I set the shear transfer framing into the existing roof. I am waiting on the engineer to specify the hardware needs, since some of this […]
we’re going to wrap up the bathroom! Let’s see, we’ve got the lighting in and the fixtures selected. Time to start on the tiling. After keeping an eye out for […]
Since I was going to the trouble to fix the floor structure and plumbing, I ran in new wiring as well. Mainly, this consisted of replacing the old 2-wire, cloth-wrapped […]
Like I said in my previous post, our plans were on a journey through the city for a building permit. In the meantime, I had some repair work to take […]