Long Overdue Update: Another Concrete Pour and More Demolition
Wow, it’s been a long time since I’ve updated the blog on progress. I have finished a lot in the past few weeks. So let’s get up to speed. I had […]
Wow, it’s been a long time since I’ve updated the blog on progress. I have finished a lot in the past few weeks. So let’s get up to speed. I had […]
There comes a point in nearly every project we do that I just get into some aspect that just absolutely sucks. On this project, that is all the stucco breakout […]
The interior framing is largely finished. There are a few things still on the to do list, though. I can’t frame the all the walls in the bathroom yet because […]
One thing about renovation is you never quite know what sorts of adventures you’ll encounter until you open up the walls. We definitely had our share of that with this […]
After a day of prep and getting the temporary support walls built, I was ready to set the first of two beams. These will hold up the roof and the […]
A lot going on today! Yesterday, I set the shear transfer framing into the existing roof. I am waiting on the engineer to specify the hardware needs, since some of this […]
So, I grew up in the midwest. I built houses in the midwest. But if you want to build much of anything in California, the seismic aspect out here is […]
Our plans were approved in May and I started in on some of what I like to call “light” demolition. This included taking down bilnds, towel bars, pulling trim off […]
we’re going to wrap up the bathroom! Let’s see, we’ve got the lighting in and the fixtures selected. Time to start on the tiling. After keeping an eye out for […]
Since I was going to the trouble to fix the floor structure and plumbing, I ran in new wiring as well. Mainly, this consisted of replacing the old 2-wire, cloth-wrapped […]